Standard Technical Features of BTG System for Supercritical 660/800 MW Thermal Units
129
xiii) Shaft grounding and
voltage monitoring
Shaft riding brushes for shaft grounding and
voltage monitoring system complete with all
software and hardware to be provided as per
manufacturer’s proven practice.
xiv) Stator winding bars
water temperature
monitoring
On line monitoring system complete with all
software and hardware and as per
manufacturer’s proven practice to be provided
to detect any abnormalities in the temperature
for individual stator bars.
xv) Rotor winding
temperature monitoring
(for static excitation
system)
Suitable arrangement as per manufacturer’s
proven practice to be provided for rotor
winding temperature measurement.
xvi) Rotor flux monitoring
Sensors for to be provided complete with all
software and hardware to detect turn to turn
shorting in field winding.
xvii) Partial discharge
monitoring
Sensors for to be provided for on-line partial
discharge (PD) monitoring complete with all
software and hardware.
xviii) Vibration monitoring
(if required)
Optical sensors (at least 6 nos.) for vibration
pickups at each end of over hang portion of the
winding to be provided.
xix) Liquid leakage detector
To be provided at all the low level points inside
the generator casing including end shields.
16.2 Generator Auxiliary Systems
16.2.1
Gas system ( for hydrogen and water cooled machines)
i) General Each generator to be provided with H
2
and
CO
2
gas supply system including gas
manifolds, CO
2
heating system (if necessary),
hydrogen pressure regulator, etc.
ii) Requirement of gas
cylinders
Requirement for one start-up and one shut-
down of a unit plus those required to be
connected on manifolds of all the units plus
total requirements for 7 (seven) days
consumption of all the units to be furnished.
iii) Hydrogen driers 2x100% duty to maintain the H
2
inside the
machine dry with 0
0
C dew point at operating
pressure with provisions to prevent
condensation.