Crown Boiler Mega-Stor Operations Instructions Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
4
IMPORTANT
The following procedures are used to size indirect water heaters based on the amount of hot water which will be required
during a given hour. In doing so it is assumed that this demand will be evenly spread out over the course of the entire
hour.
THESE SIZING PROCEDURES ARE PROVIDED AS A GUIDE TO ASSIST THE PROFESSIONAL CONTRACTOR
IN SIZING MEGA-STOR TANKS. BECAUSE OF THE LARGE VARIETY OF DEMAND SITUATIONS
ENCOUNTERED IN THE FIELD, CROWN BOILER COMPANY CANNOT GUARANTEE THE SUITABILITY OF
THESE PROCEDURES TO ALL INSTALLATIONS.
Residential Applications
Table 3.1 shows the minimum sized Mega-Stor that should be considered for one and two family homes based on the numbers

order to meet space heating demand, there is usually no need to add boiler capacity just for the Mega-Stor. Note that the sizing
recommendations shown in Table 3.1 may not provide satisfactory performance when there are unusually high peak demands,

-
pool tubs, it is recommended that the Mega-Stor have a domestic water volume at least as large as the nominal volume of the tub.
Commercial Applications
-
ter of the ASHRAE Applications Handbook. Then use the data provided in Tables 2.1, 3.2, and 3.3 to select the boiler and Mega-
Stor.
Table 3.1: Mega-Stor Sizing for Typical One and Two Family Units
(a) (b) (c) (d) (e)
Number of
Bathrooms
Number
of Bed-
rooms
Mega-Stor
First Hour
Requirement
(GPH)
Min. Boiler Output
(MBH)
1 to 1 1/2
1 MS-26 43 27
2 MS-40 60 36
3 MS-40 60 36
2 to 2 1/2
2 MS-40 60 36
3 MS-40 70 36
4 MS-40 72 38
5 MS-53 90 47
3 to 3 1/2
3 MS-53 72 47
4 MS-53 82 47
5 MS-53 90 47
6 MS-53 92 47
III. SIZING
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 27 28

Comments to this Manuals

No comments