Crown Boiler TWZ200 Specifications Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
11
VI Venting
Vent installation must be in accordance with local building codes, or the local authority having jurisdiction.
Typical vent installation is illustrated by Figure 6.0. The components of vent installation are the vent connector (breeching),
barometric draft regulator, and chimney.
1) Acceptable Chimneys - The following chimneys may be used to vent a TWZ series boiler:
Listed Type L vent - Install in accordance with the manufacturer’s instructions, the terms of its listing, and applicable
codes.
Masonry Chimney - The masonry chimney must be constructed in accordance with the latest edition of Standard
for Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances (NFPA 211) and lined with a clay liner or other
listed lining system. Do not vent a TWZ series boiler into an unlined chimney.
FIGURE 6.0: TYPICAL VENT SYSTEM INSTALLATION AND COMPONENTS
WARNING
• IMPROPERVENTINGMAYRESULTINPROPERTYDAMAGEAND/ORTHERELEASEOF
FLUE GASES, WHICH CONTAIN DEADLY CARBON MONOXIDE (CO), INTO THE HOME,
WHICH CAN CAUSE SEVERE PERSONAL INJURY OR DEATH.
• INSPECTEXISTINGCHIMNEYBEFOREINSTALLINGBOILER.FAILURETOCLEANOR
REPLACE DAMAGED PIPE OR TILE LINING WILL CAUSE PROPERTY DAMAGE, SEVERE
PERSONAL INJURY OR DEATH.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 47 48

Comments to this Manuals

No comments