II. Boiler Assembly
A. Remove Crate
B. Remove boiler from skid.
Figure 2: Skid Removal
Tapping Size Purpose
A 2” Supply
B 2” Return
C 3/4” Relief Valve
D 3/4” Limit
E 3/4” Auxiliary Limit
F 3/4” Washout
G 3/4” Drain
Table 3: Purpose of Tappings
Figure 3: Tapping Locations
Comments to this Manuals